The challenge was to rationalise the O2 property portfolio by refurbishing all major sites in line with the O2 design concept. We needed to design, develop and interpret the O2 corporate design to a practical and deliverable concept within agreed budgets allowing an increased head count at all sites to allow property disposal.
The JAS Works Approach
Working with the O2 property team, we identified all refurbishment requirements which through good design had the potential for increased occupancy which was achievable in a cost-effective way. We managed an extremely challenging phased undertaking of the fit out, and we were able to supply furniture on site in line with timescales, allowing O2 least operational disruption.
Project completion
A reduced building portfolio resulted in reduced property costs, and a fully functional workspace environment of which O2 were greatly satisfied. |